Field Park

Plan Created: 2006
Plan Reviewed: 2024
Next Review: TBD

Continued investment in our parks and facilities is critical to the District’s mission. The Park Board’s policy states that each park site plan will be revisited and updated within a 10-year period. The Park District is in the process of revisiting each park site plan per this policy in order to identify additional park amenities desired by our residents, to budget strategically for these improvements and to be prepared for grant opportunities.

If you have questions or would like to provide feedback on park plans currently in progress, contact Bill Hamilton, Superintendent of Parks & Planning..

Timeline Icon

August

Rammed earth walls are complete.

Construction of a rammed earth wall at Field Park, with a yellow JCB loader and red Werner ladders present.
Timeline Icon
Construction of Field Park building with workers and a yellow JCB telehandler.

July

South wall nears completion and slab is scheduled to be poured. ComEd has been onsite for electrical installation work.

Timeline Icon

June

Underground plumbing is complete and underground electrical work is underway.

Construction of the Field Park building shows the foundation and framing. Trenches for plumbing are visible.
Timeline Icon
Construction of a rammed earth wall at Field Park, showing wooden formwork and the layered earth texture.

May

Progress is being made on the rammed earth walls.

Timeline Icon

April

The first wall passed inspection.

Construction of a rammed earth wall at Field Park, showing wooden formwork, rebar, insulation, and the layered earth.
Timeline Icon
A white Bobcat S650 skid-steer loader is positioned next to wooden formwork for a concrete structure at the Field Park

April

A mock wall was built and lettering was approved. Underslab work is to begin soon.

Timeline Icon

April

Framing for rammed earth is finalized and a mock wall is being built for review.

Construction site with wooden formwork for a concrete structure, a yellow Kaeser air compressor, and a Gar Bro concrete
Timeline Icon
Construction workers build concrete forms for a new structure at Field Park.

March

Gravel and sand delivery coming soon. Framing work continues.

Timeline Icon

March

Wall construction slated to begin mid-March.

Construction site for Field Park with wooden framing and a red tarp covering materials. The ground is covered in gravel.
Timeline Icon
Wooden formwork for concrete foundation walls is erected at the Field Park construction site.

February

Framing for rammed earth walls continues.

Timeline Icon

January

Framing for rammed earth walls is ongoing. Work on the walls will begin in early March. Current work includes pouring the slab and underground work.

Construction worker in overalls inspects plywood formwork for a concrete foundation at Field Park.
Timeline Icon
January
Construction site at Field Park with an excavator digging in the dirt and rebar sticking out of concrete walls.
Backfilled around foundation and added gravel. Roofing details are being discussed.

January

Timeline Icon

December

Concrete foundations were poured, and dowels were set.

Construction workers pour concrete into forms at the Field Park construction site. Rebar is visible.
Timeline Icon
Field Park construction site with concrete forms and rebar in the snow.

December

Foundation framing and scaffolding completed.

Timeline Icon

December

Ongoing work on the composition of the rammed earth walls, including color selection, seal coating, and lettering molds.

A concrete structure with the letters "E" and "M" displayed. The "E" is a white cutout, and the "M" is carved into the
Timeline Icon
Construction site at Field Park with rebar and concrete forms covered in plastic sheeting. A gazebo is visible in the

November

Foundation walls are being prepared for pouring. Due to pending weather (snow and single digits), the pour has been delayed and will occur once the temps are above freezing and stable.

Timeline Icon

November

November
Construction workers prepare rebar and concrete forms for the Field Park building foundation.

Concrete foundation wall forms are onsite and installation has begun.

Timeline Icon
Construction site at Field Park showing trenches with concrete footings and rebar, with orange safety fencing in the

November

Column footings have been poured, with foundation wall forming coming soon.

Timeline Icon

October

October
Construction site at Field Park with excavators, trenches, gravel, and portable restrooms.

Check out the latest updates:

Strip footing excavations for east, south, and west walls complete. Rebar placement and forming of strip footings in progress.

Timeline Icon
Construction workers and an excavator are on site at Field Park, preparing the foundation for a new building.

October

Forms for the foundation wall were put in.x

Timeline Icon

August

Fencing went up and initial demolition began.

Construction equipment and materials are present in a park area undergoing landscaping, with orange safety fencing visible.

Acquired in 1916, the park is named after children’s author Eugene Field and includes a center originally designed by John S. Van Bergen. The center has been significantly modified over the years. Woodbine Avenue between Berkshire and Division was vacated by the Village in 1960, to expand the park and connect it to the Mann School grounds, creating roughly five acres of total open space.